Semester 2 W2 | Preparing Production Gantt Chart & Change of Plans

  • Writer: Soo Zhi Jing
    Soo Zhi Jing
  • Nov 28, 2020
  • 1 min read

There is a lot of things to get done and I will need to plan my time efficiently so that I'm on track on my production phase. With many subjects to juggle at the same time this semester, I created a Gantt Chart for this project. Link to Gantt Chart: Gantt Chart SooZhiJing (2).xlsx

Let me explain my Gantt Chart a bit, from week1-4 I will be building the scenes and simultaneously fit the assets to unity for testing too. On week 3-5 I will be design UI designs, animating and rigging characters as well as coding the project.


I try to follow this Gantt Chart as strictly as possible but there were some difficulties for me. In terms of visuals, I have no problems following the chart but as of the coding part, the Oculus Headset is not always exclusive to me for lending and I will need to adhere to booking times with other students. I liaised with our person in charge to talk about the timings and I could not lend the headset on week 4 to mid of week 5 which clashes with my initial coding time period. Due to this problem, I lend the headset earlier which is from week 1-3 for testing. I have to quickly get some of the visuals done to continue testing. So far this is the only change of plans, everything is going smoothly as planned at the moment.

Comments


© 2020 by rszhijing. Proudly created with Wix.com

bottom of page